Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 21, 2024

March 22, 2024

No Information to Display

4815 Alameda Ave

Renovation

No Information to Display

$700,000.00

Public - County

img_map_placeholder

4815 Alameda Ave, El Paso, TX

22

18

39

Subscribe to View Full Documents

The primary scope of work generally includes, but is not limited to, the following: 1. Bid Form Item A - Topping slab repair which requires: a. Verifying the extents of topping slab damage visually or by hammer sounding or chain dragging exposed concrete surfaces in the vicinity of repairs indicated on the plans. Visually mark extents and verify extent with Owner's representative prior to demolition. b. Demolition of existing, damage concrete c. Placement of new concrete topping slab d. Pavement markings shall be repainted to match existing after completion of all topping slab repairs. The cost of pavement markings shall be included in the unit cost for topping slab repair 2. Item B - Partial-depth concrete repair which requires: a. Verifying the extents of concrete damage visually and by hammer sounding exposed concrete surfaces in the vicinity of repairs indicated on the plans. b. Demolition and removal of damaged concrete c. Placement of repair materials Questions Due Date: Jan 24th 2024, 2:00 PM MST

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.