Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

May 1, 2024

August 31, 2024

651 10th Ave

Remodeling

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

651 10th Ave, Greeley, CO

Subscribe to View Full Documents

Reference Number 0000332650 Acceptance Deadline 10/26/2023 at 2:00 PM MT Questions are submitted online No Questions pertaining to the project may be directed to purchasing@greeleygov.com The bleachers on the pool side of the locker rooms need to be re-configured to make room for the new doors from the locker rooms into the pool area. It is important that the contractor use temporary walls to keep the public from entering the construction zone and dust protection to alleviate as much dust from the build getting into other areas of the building. The drains are accessible from the weight room in the lower level. The weight room equipment will have to be re-located prior to the work starting, once the work is completed the equipment will have to be moved back. This will be done by others. The current locker rooms must remain open, on a limited basis, until the family changing rooms are complete. Once the family changing rooms are completed, they will be used so the locker rooms can be closed for construction. As stated above in the Goals section, the current locker rooms will be demolished and rebuilt. Both men and women will have individual showers with benches and doors for more privacy. The shower area will have a hard ceiling and updated lighting. A drop ceiling will be installed in the general locker room. The new locker room walls will be tiled and epoxy grouted, The floor will be epoxy coated, with updated lighting throughout. New vanity solid surface counter tops and under mounted sinks and ADA compliant faucets, hose bibs will be installed under the vanities, these will be used to aid in cleaning. Lockers will be installed at the opposite ends of the room on a concrete type of bench. The architectural firm has been retained to answer RFIs. The City of Greeley retains the right to reject any and all and to waive any informality as deemed in the best interest of the city

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.