Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 21, 2022

May 25, 2022

No Information to Display

4200 Springdale Rd

Renovation

No Information to Display

$35,576.00

Public - City

img_map_placeholder

4200 Springdale Rd, Cincinnati, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Projected Contract Commencement: May 25, 2022 Colerain Township reserves the right to reject any or all proposals, to award contracts in whole or in part, to further negotiate proposals in whole or in part, or to waive any informalities or irregularities in the submitted proposals. Improvements include: Administration Offices, Police Dept., Trustee's Chamber, and Basement - Installation of a new BCU (Building Controls Unit) and necessary UPCM (Universal Programmable Control Modules). The scope of work shall include the following: 1. Replace the current Trane Building Control Unit (BCU) and (5) Trane UPCM controllers, which currently operate the four air handling units and mechanical room equipment (boilers and chiller). 2. Integrate (if possible) the (50) existing VAV boxes into the new control system. 3. Provide a complete operating system for controlling the heating, cooling and ventilation for each of the (4) areas served by the air handling units. 4. Provide a new BACnet based operator interface for the BAS computer to provide graphics, alarms and history. 5. Provide start up and check out of new controls and controls system after installation is complete. 6. Provide a minimum, of 8 hours operator training, to on site personnel, on operations and maintenance of new controls and controls system. 7. Provide commercial standard warranty for new controls components and controls system. 8. Provide one year workmanship warranty

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects