Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 7, 2023

December 17, 2024

3450 Blue Heron Dr

Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

3450 Blue Heron Dr, Greenville, NC

Our team is requesting plans for this project.

Subscribe to View Full Documents

The work includes all labor, equipment, and materials to complete in every detail of the work indicated on the plans and specifications. Specifically, all work incidental thereto Wildwood Park Bridges & Boardwalks as part of the Wildwood Park Observation Tower and Trails Project including, but not limited to, demolition, earthwork, drainage, bridges & boardwalks construction, paving, and stabilization. The goal for Minority and / or Women Business Enterprise (M/WBE) participation is MBE 10% and WBE 6%. Each goal must be met separately. Exceeding one goal does not satisfy requirements for the other. If applicable, each proposal shall be accompanied by a bid bond executed by a corporate security licensed to do so under North Carolina law, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof, a bidder may offer a certified check from a financial institution insured by the Federal Deposit Insurance Corporation (FDIC) as a deposit. Questions about this bid should be directed to Mark Nottingham, Parks Planner at 252.329.4242 or via email: mnottingham@greenvillenc.gov. To whom the contract is awarded, a Performance and Payment Bond will be required for one hundred percent (100%) of the contract price. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days after the bid date. The City Council of the City of Greenville reserves the right to reject any or all proposals. The liquidated damages for this contract are One Thousand Dollars ($1000.00) per calendar day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects