Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 14, 2023

August 14, 2023

No Information to Display

2415 Washington Blvd

Remodeling

No Information to Display

$10,040,000.00

Public - City

img_map_placeholder

2415 Washington Blvd, Ogden, UT

Subscribe to View Full Documents

**As of August 17, 2023, selection has not been made yet. A timeline for award has not yet been established. Weber County (Owner) and it's hired design professional, VCBO Architecture (VCBO) are interested in working with a qualified Construction Management/General Contractor Firm ("Proposer") and requests proposals for construction management services, for the pre-construction phase, and general contractor services, for the construction phase, of an extensive interior remodel of The Ogden Eccles Conference Center (OECC), located in Ogden, Utah ("Project"). More specifically, it is envisioned that the Project will involve modernizing the OECC for the future with new/updated wall and floor treatments, technology, A/V, lighting, furniture, fixtures (capable of bringing a hospitality feel to welcoming flexible spaces), and priority improvements to "back of house" areas. Overall, the County is seeking a talented, innovative, and accomplished team that can assist the County in carrying out the above described Project. Closing Date and Time for Questions: 6/7/2023 @ 5:00 pm Closing Date and Time for Receipt of Proposals: 6/14/2023 @ 2:00 pm Announce Proposer Shortlist: 6/21/2023 Approximate Interview/Oral Presentation: 6/28/2023 Approximate notice of results and award: 6/29/2023 Construction is expected to begin as early as January 2024. f you need more information on this event, please contact: Jason Horne jhorne@co.weber.ut.us Matt Clements +1 801-399-8868 mclements@co.weber.ut.us The Project budget is $10,040,000. PROJECT DESCRIPTION: Schematic Design Drawings and Narrative from VCBO Architecture are included here as ATTACHMENT D. These documents adequately describe the current scope of the project.

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.