Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 30, 2022

April 29, 2022

May 20, 2022

1625 Co Rd 102

Renovation

No Information to Display

$66,279.00

Public - County

img_map_placeholder

1625 Co Rd 102, Guffey, CO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Provide itemized list of labor and materials used to replace and repair roof shingles. i. Removal and disposal of old; asphalt shingles, paper and ice & water shield ii. Installation; new metal roofing and synthetic high temperature underlayment iii. Installation; high temperature ice and water shield as required by Building Code iv. Disposal of all job site materials v. Quantity of materials shall be verified by bidder/contractor Location(s) of service requested i. Guffey Community Center ii. Guffey Library Community Center 24 total squares (shingle count) 42.5 feet of ridge 127.5 feet of eave 109 feet of rake 42.5 feet of sidewall flashing Total expenses including material, labor and fees will not exceed $31,200.00 Library 42.5 total squares (shingle count) 25 feet of ridge 150 feet of eave 95 feet of rake 51 feet of sidewall flashing Total expenses including material, labor and fees will not exceed $41,600.00. Total project cost for both job sites will not exceed $72,800.00. Job site will be cleaned throughout construction lifecycle including haul away and disposal of all materials. Potential onsite staff includes surveyors, engineers, management, laborers, inspectors and other authorized staff. Project build lifecycle from onsite start to finish is approximately 21 days. Pre-proposal questions can be submitted via email prior to 3.28.2022. Questions regarding the building and site (including surveys) shall be directed to Mike Kinnaird, Facilities and Fleet Department Manager, 719.839.0268 (Phone), mkinnaird@parkco.us.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.