Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 5, 2022

June 29, 2022

August 19, 2022

37 Chem. du Trait Carré

Renovation

No Information to Display

$207,000.00

Public - State/Provincial

img_map_placeholder

37 Chem. du Trait Carré, St-Joachim-de-Montmorency, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1577520 Deadline for receipt of complaints: 2022-03-21 Submission sent electronically accepted: Yes, in a single submission document Expected duration of the contract without the options (in months): 9 Estimated value: $200,000 to $302,899 Bid guarantee Nature of the Bid Guarantee: Guarantee Bank draft Certified check (certified) Money order Irrevocable letter of guarantee Value of the Bid Security (amount or percentage) 10% of the price proposed in its bid The contractor acknowledges that the public body may have retained or may retain the services of another contractor to carry out minor work (electricity, alarm system, intercommunication system, etc.) in connection with this project. The contractor will be required to coordinate the work with the contractor retained by the public body. The Premi re-Seigneuries School Service Center wishes to retain the services of a construction contractor to refinish the palestra of its Pionni re school located at 37, rue du Trait-Carr , Saint-Joachim (Quebec) G0A 3X0 . Mainly, the work consists of installing a new floor finish in the palestra , painting the walls, adding acoustic panels and replacing light fixtures and basketball hoops. The work must take place from June 29, 2022 to August 19, 2022. Provisional acceptance and submission of end-of-site documents on August 19, 2022. Performance bond and obligation bond for wages, materials and services of each corresponding 50% is required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. award is subject to final approval.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects