Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 17, 2022

May 16, 2022

August 9, 2023

Multiple Locations

Site Work

No Information to Display

$712,718.00

Public - City

img_map_placeholder

Multiple Locations, Webster, MA

Subscribe to View Full Documents

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work includes a Base Bid, Bid Alternate 1, Bid Alternate 2, and Bid Alternate 3. The total work inclusive of the Base Bid and Add Alternates is approximately 23,000 linear feet of 8-inch, 10-inch, 12-inch, and 18-inch Cured-In-Place-Pipe (CIPP) lining, 1,200 vertical feet of manhole sealing, 260 service laterals to be sealed, and sewer spot repairs. Substantial Completion: Contractor shall pay Owner $1,500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 3.1 above for Substantial Completion until the Work is substantially complete. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract), for completion and readiness for final payment, Contractor shall pay Owner $1,500 for each day that expires after such time until the Work is completed and ready for final payment

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.