Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 23, 2023

July 24, 2023

October 12, 2023

141 Gasque Dr

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

141 Gasque Dr, LaFayette, GA

Subscribe to View Full Documents

**As of July 31,2023, this project has not yet been awarded. A timeline for award has not yet been established.** The work shall consist of the furnishing of labor, material, and equipment for the Runway Pavement Rehabilitation and Realignment. Address any questions regarding this Notice in writing to Jason Elliott of WK Dickson at jelliott@wkdickson.com. Questions and answers will be distributed to all plan holders via an addendum. All questions must be received by WK Dickson by Friday, March 10, 2022 at 5:00 PM local time. Questions received after this date and time may not receive responses before the bid opening. Each proposal shall be accompanied by a cash deposit or certified check, drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, in an amount equal to not less than five percent of the proposal. In lieu thereof, the bidder may offer a bid bond of five percent of the bid prepared on the Bid Bond form contained within the Contract Documents or a Surety Company's Standard Bid Bond form, duly executed by the Bidder as principal and executed by a surety company licensed under the laws of Georgia to execute such bonds and listed in the latest issue of U. S. Treasury Circular 570, conditioned that the surety will, upon demand, forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law By submitting a bid, the Contractor certifies that he has under his direct control, or at his disposal, the men, equipment, and materials required to execute this work as specified. Lack of such control or availability of men, equipment, or materials shall constitute failure to properly execute the Contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract price, with a surety or sureties legally authorized to do business in the State of Georgia The Owner reserves the right to reject any or all bids and to waive informalities and technicalities. Bid Results: BID SCHEDULE NO. 1 C.W. Matthews Contracting Co., Inc-8,696,096 BID SCHEDULE NO. 2 Talley Construction Co., Inc.-$ 9,562,812.37 Question Deadline 06/12/2023 at 5:00 PM ET Address any questions regarding this Notice in writing to Jason Elliott of WK Dickson at jelliott@wkdickson.com.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects