Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

March 7, 2024

Multiple Locations

Site Work

No Information to Display

$620,269.00

Public - City

img_map_placeholder

Multiple Locations, Early, TX

Subscribe to View Full Documents

Base Bid: Approximately 1090 LF of 10" through 6" PVC gravity sewer line replacement, service connections, manholes, and manhole reconnections Alternate Bid #1: Approximately 2060 LF of 8" through 6" PVC gravity sewer line replacement, service connections, manholes, and manhole reconnections. Bids will be taken for three separate types of work: labor & materials, labor only, and materials only. Contractors may submit bids for any or all types. ESTIMATED COST Bid "A" - Labor & Materials Base Bid = $400,000 Alternate #1 = $550,000 Bid "B" - Materials Only Base Bid = $65,000 Alternate #1 = $110,000 Bid "C" - Labor Only Base Bid = $335,000 Alternate #1 = $440,000 This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the State of Texas nor its departments, agencies, or employees are or will be a party to this Advertisement for Bids or any resulting contract. The Owner reserves the right to waive any informalities and to reject any or all bid In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex (including pregnancy), sexual identity, gender identity, national origin, age (40 or older), disability or genetic information. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe. Bid Results : Base Bid A : Bontke Brothers Construction Company - $ 390,292.0 Base Bid B : B&L Construction Co - $ 35,683.45 Base Bid C : LeeTech Solutions, LLC - - $ 194,294.00

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.