Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 22, 2022

April 4, 2022

May 12, 2022

18870 Jurupa Ave

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

18870 Jurupa Ave, Bloomington, CA

Subscribe to View Full Documents

Crestmore Elementary School Playground Equipment and Surface Replacement Project, Bid No. #22-08 FAC . The Project consists of all labor, materials equipment and services necessary to: Construct and Install: 1. Remove existing Playground Structure and Playground Covering 2. Sub-surface drainage system 3. New Playground Equipment (Owner furnished/Contractor Installed) 4. New Playground Rubberized Surface. 5. Supplemental SOW Contractors shall follow the instructions in this document, and shall submit all documents, forms, and information required for consideration of a Bid. Colton Joint Unified School District ("District") will evaluate information submitted by the apparent low Bidder and, if incomplete or unsatisfactory to District, Bidder's bid may be rejected at the sole discretion of District. Bidders must submit with their Bids a cashier's check or a certified check payable to District, or a bid bond by an admitted surety insurer of not less than ten percent (10%) of amount of base Bid, plus all additive alternates ("Bid Bond"). If Bidder chooses to provide a Bid Bond as security, Bidder must use the required form of corporate surety provided by the District. The Surety on Bidder's Bid Bond must be an insurer admitted in the State of California and authorized to issue surety bonds in the State of California. Bids submitted without necessary bid security will be deemed non-responsive and will not be considered. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. Work shall be completed within Forty-five (45) consecutive calendar March 28th , 2022 Anticipated Project Start

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.