Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 14, 2022

January 15, 2024

January 31, 2028

391 Co Rd 4965

Addition, Demolition, Renovation, Site Work

No Information to Display

$436,000,000.00

Public - State/Provincial

img_map_placeholder

391 Co Rd 4965, Leonard, TX

Subscribe to View Full Documents

**As of May 2023, a timeline for an award announcement has not been released.** NTMWD has chosen the use of the CMAR project delivery method for this Project. The procurement and the provision of Services will be in accordance with Texas Government Code Chapter 2269 and this RFQ. Selection of the CMAR will be made using a two-step procurement and selection process. The NTMWD has delegated its authority under this Chapter regarding all actions required by this Chapter except for execution of the CMAR agreement to the Executive Director or her designees. Based on the preliminary work done to date, the conceptual construction cost value of this Project is $436 million. F&N Job No. : NTD16260 PROJECT NO. 101-0600-21 Leonard Water Treatment Plant Phase II PROJECT NO. 101-0601-21 Leonard Water Treatment Plan Terminal Storage Reservoir Phase II PROJECT NO. 101-0602-21 Bois d'Arc Lake Raw Water Pump Station Phase II PROJECT NO. 101-0603-22 Leonard Water Treatment Plant High Service Pump Station - South The North Texas Municipal Water District (NTMWD) provides wholesale water services to 80 communities and more than 2.2 million residents of North Texas. Updated demands and need for redundancy have accelerated the need for Bois dArc Lake Program Phase 2 expansion. The Project will consist of: 1) A second 70 million gallons per day (MGD) phase of the Leonard Water Treatment Plant for a total capacity of 140 MGD which consists of the following processes: pre-oxidation with chlorine dioxide; coagulation, flocculation and sedimentation; ozonation; biologically active filtration; pH adjustment; free chlorine disinfection; chloramination; fluoridation and clear well storage. 2) Expansion of the Bois d Arc Lake (BDL) Raw Water Pump Station (RWPS). 3) A new High Service Pump Station -South (HSPS-S) in addition to expansion the High Service Pump Station - North (HSPS-N) which is currently under construction. 4) Addition of a second cell (210-million-gallon (MG) capacity) at the Terminal Storage Reservoir (TSR) at the Leonard Water Treatment Plant (WTP) site. For further Project information, please see RFQ Section 5.1 Additional Information Attachment 1: Project Scopes of Work and Additional Background Project Information. Please direct all questions related to this RFQ to the Q&A Section.

71 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.