Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 25, 2023

July 10, 2023

March 1, 2024

435 Monarch Ave

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

435 Monarch Ave, Ajax, ON

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Bids will only be accepted from General Contractors who have already been pre-qualified to bid for this project as per RPQ No. PQ2302 General Contractors - Fire Station No. 2 Renovation. The Town of Ajax is soliciting Bids from pre-qualified General Contractors to provide all labour, material, fuel, equipment and services necessary to complete the renovations to Fire Station No. 2 in accordance with the Drawings and Specifications. The summary of work consists of a major renovation of an existing Fire Station, the scope of work includes, but is not limited to: - Demolition of interior finishes and fixtures including doors, non-load and load bearing masonry partitions, millwork, ceiling and floor finishes and washroom/shower fixtures. - Demolition of existing mechanical, plumbing and electrical services to suit the new layout. - Installation of new non-load bearing steel stud framed gypsum board interior partitions, doors, new finishes and fixtures (flooring, walls, ceilings, washrooms and showers). - Electrical work including switches and receptacles to suit the new floor layout as well as relocating existing LED lighting to suit the new floor layout. - New mechanical work including HVAC, plumbing and a sanitary pump system. Project Coordination Challenges include, but are not limited to: - The Fire Station will remain in full operation throughout the course of the work. - The Contractor will be responsible for supplying temporary accommodations on-site for the fire crew of 5 during construction (trailer's on-site for sleeping, cooking, office work, etc.) - The apparatus bay will remain in use and access to the driveways must always be kept clear during construction. - Work occurring within the apparatus bay will be coordinated with the fire crew. - A detailed site safety construction plan will be required to successfully carry out this work. Documents can be obtained at: https://ajax.bidsandtenders.ca Question Deadline: Mon May 15, 2023 11:30:00 AM (EDT) Awarded to Anacond Contracting -- $3,316,617.80 (Inclusive of Tax)

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.