Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 15, 2025

No Information to Display

Multiple Locations

Site Work

No Information to Display

$2,800,000.00

Public - City

img_map_placeholder

Multiple Locations, Strathmore, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

New 750mm Main Sanitary Trunk to replace the existing twin trunk from Manhole 15M to 10M. The existing sanitary trunk consists of a twinned 350mm and 450mm trunk sewer which includes a crossing of Highway 1. The new trunk will have to take into account the limited workspace available within private property and the possibility of re-routing the alignment in the area of Highway 1, Lakeside Blvd, and Archie Klaiber Trail. TIMELINE: Design is ongoing. Tender and construction may proceed in 2025. Further update may be available late 2023/2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.