Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 24, 2022

March 28, 2022

September 4, 2022

Dawson Ave

Site Work

No Information to Display

$694,763.00

Public - City

img_map_placeholder

Dawson Ave, West Haven, CT

Subscribe to View Full Documents

The work includes, but is not limited to, CIPP lining of sewers and manhole rehabilitation, including monolithic manhole lining, rebuilding chimneys, and replacement of frames and covers. Bids must be enclosed in an opaque, sealed envelope and plainly marked with the Project Title and shall contain the name and address of the bidder on the envelope. Failure to comply with the requirements of this paragraph may be deemed to render a proposal non-responsive. Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of five percent of the Bid. Bidders may not withdraw their Bids for a period of 120 days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the Bids. Contract Documents are also available for examination only. Due to the City of West Havens current requirements, the Contract Documents can be viewed at City Hall, West Haven, Connecticut, between the hours of 9:30 AM and 4:30 PM daily by appointment only, except Fridays, Saturdays, Sundays and holidays. Please contact the City Engineer, Abdul Quadir at 203-937-3575 to coordinate. Bidders can also request documents to be mailed for an additional cost, which will also be provided by Joseph Merritt & Company. Contract documents purchased are not returnable and are nonrefundable. The Successful Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Complete instructions for filing Bids are included in the Instructions to Bidders. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. The Contract Time shall commence 20 days following the Effective Date of the Agreement and the Contractor shall fully complete the Work within 160 Calendar Days and in accordance with the terms as stated in the Agreement. Active construction shall be limited to 90 Calendar Days. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by the State of Connecticut, Department of Environmental Protection. Neither the State of Connecticut nor any of its departments, agencies or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to the requirements contained in Section 22a-482(h), (j) and (o) of the Regulations of Connecticut State Agencies. Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) policies of the State of Connecticut are applicable to this Contract. The requirement for MBE/WBE Subcontractor participation, expressed as a percentage of the total contract amount, shall be a minimum of 8.0 percent with the following makeup, MBE 3.0 percent and WBE 5.0 percent. Failure to meet or exceed the required percentages shall render a bid non-responsive and cause the rejection of the Bid. Clean Water Fund Memorandum dated June 19, 2019 must be completed and submitted with the Bid, or that Bid will be deemed nonresponsive. Wage rates for this Project are subject to the minimum wage rates as per State of Connecticut Labor Department "Prevailing Wage Rates" and Federal Davis-Bacon Act. Bidders and subcontractors are required to ensure equal opportunity employment as noted in the Governor's Executive Orders 3 and 17.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.