Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
February 18, 2022
March 18, 2022
April 17, 2022
299 Everett Ave
Renovation
No Information to Display
$3,609,000.00
Public - City
299 Everett Ave, Chelsea, MA
Should the successful bidder fail to commence or diligently perform according to the terms of the contract, the successful bidder agrees to pay to the City of Chelsea, as liquidated damages, Two Hundred Fifty Dollars ($250.00) per calendar day that the successful bidder fails to commence or diligently perform the work in accordance with the contract documents and/or is in violation of the contract. Liquidated damages assessed under this provision shall be deducted from any payment(s) due to the successful bidder. The entire existing roof assemblies shall be removed to expose decking. All repairs needed to be done before new roof installation. B. Install insulation assembly per these specifications. C. Install one ply of specified SA Vapor Retarder sheet directly to the existing wood deck. Install one ply of specified base sheets into modified cold adhesive per specifications. Install specified modified cap sheet into modified cold adhesive perspecifications. D. Seams on mineral cap sheet shall be heat welded with a 4" blade. Base flashing system shall be installed at all projections and perimeters using a 2- ply flashing system. The first ply shall be specified base sheet in trowel grade adhesive. The top flashing ply shall be the specified modified bitumen membrane with a polyester-fiberglass scrim set in trowel grade modified cold adhesive. F. Remove and replace existing roof drains. New Smith 10 10-R-C-CID drains, or equal, shall be installed. Drain diameter shall be determined by diameter of existing drain openings. All drain bowls shall be insulated and sumped with tapered insulation. Remove and replace drain litre down to one foot passed the elbow, approximately eight feet [8'] of pipe to be field verified. The contractor shall be responsible to provide all drain accessories. All drains cleared to 100ft outside of building. G. Miscellaneous flashing, caulking and accessories shall be installed. H. Prefabricated edge metal shall be installed at locations shown on drawings.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Chelsea, MA
Bid Date: Jan 11 2024
Chelsea, MA
Bid Date: Oct 03 2024
Chelsea, MA
Bid Date: Oct 10 2024
Chelsea, MA
Bid Date: Sep 19 2024
Chelsea, MA
Bid Date: Nov 02 2023
Chelsea, MA
Bid Date: Oct 19 2023
Chelsea, MA
Bid Date: Oct 19 2023
Chelsea, MA
Bid Date: Nov 16 2023
Chelsea, MA
Bid Date: Oct 26 2023
Chelsea, MA
Bid Date: Oct 26 2023
Chelsea, MA
Bid Date: Aug 07 2023
Chelsea, MA
Bid Date: Aug 31 2023
Chelsea, MA
Bid Date: Sep 07 2023
Chelsea, MA
Bid Date: Aug 09 2023
Chelsea, MA
Bid Date: Jul 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
