Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

March 18, 2024

January 13, 2025

609 Charles E Young Dr E

Renovation

No Information to Display

$3,757,886.00

Public - State/Provincial

img_map_placeholder

609 Charles E Young Dr E, Los Angeles, CA

Subscribe to View Full Documents

The Department of Chemistry and Biochemistry proposes to renovate the existing Molecular Sciences Building (MSB) 3rd floor rooms 3221, 3221LB, 3221A, 3426, 3225, 3225LB, 3235, 3235LB, 3235A, 3436, and 3440 into one organic chemistry research lab. The renovated lab would be capable of accommodating approximately twenty students/researchers and handle the projected volume of procedures and experiments required for current and future research needs. The project area is 4,675 ASF (5,060 gsf) located on the west side of the northeast wing of the building. MSB is an eight-story, 97,654 ASF (178,666 GSF) lab and office building constructed in 1993. The project scope includes reconfiguration of the entire laboratory space, including demolition of existing fume hoods and installation of (20) University Furnished/Contractor Installed fume hoods. Additional work includes reconfiguration of existing mechanical ductwork system and rerouting of existing plumbing and electrical utilities to accommodate the proposed program. If Alternate No. 1 is not taken, Contractor shall patch and repair the existing infill panels within the storefront where perpendicular walls are to demolished under the base bid B License (General Building) The estimated construction cost is $3,757,886.00 LICENSE REQUIREMENTS: The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. The project area is 4,675 ASF (5,060 gsf) located on the west side of the northeast wing of the building.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects