Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 23, 2022

November 6, 2023

January 1, 2025

Veterans Memorial Hwy NE

New Construction, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Veterans Memorial Hwy NE, Rome, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of August 4, 2023, a construction manager has been awarded and construction is expected to begin in November 2023. The Rome City School System plans to construct a new 6-8 middle school configured as series of classroom wings and an athletics wing with a footprint of approximately 373,000 S.F. The new buildings are to be built on a undeveloped property northeast of the existing middle school across Veterans Memorial, at the end of Three Rivers Dr. where currently school buses are parked. The academic buildings will serve grades 6-8 and will house all academic curriculum, including but not limited to; cafeteria/ kitchen, classrooms, science labs, CTAE Labs, Storm shelter, a third level media center and supporting administration space. An attached athletics building will house a competition gymnasium, an auditorium, multipurpose room, auxiliary gym, a natatorium, CTAE labs, locker rooms, and all other required support spaces. Construction will be at a minimum, 2 story with a 3-story main entry space, steel frame with CMU infill, low slope framed roof, slab on grade lower floor, slab on metal deck upper floor(s), brick, EIFS, & storefront/Curtain wall exterior facade, and interior CMU infill. Deadline for Written Questions June 16, 2022 The school system reserves the right to amend this RFP prior to the proposal due date. Please direct all questions regarding this RFP and the program it represents to: Tim Williams Director of Maintenance Rome City Schools 508 East Second Street Rome, GA 30161 Ph: 706-236-5064 Email: jtwilliams@rcs.rome.ga.us Mathew Melara, AIA Architect Southern A & E, LLC 7951 Troon Circle Austell, GA 30168-7755 Ph: 770-819-7777 Email: mmelara@southernae.com

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.