Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 4, 2022

May 4, 2022

January 13, 2023

185 Main St

Renovation

No Information to Display

$3,938,000.00

Public - State/Provincial

img_map_placeholder

185 Main St, New Britain, CT

Subscribe to View Full Documents

As of October 24, 2023, this project has been completed by the awarded general contractor. Construction Costs: Greater Than $500,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 3,864,339.00 To $ 4,271,112.00 Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 1,948.00 Per Calendar Day Beyond Substantial Completion. $ 1,625.00 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Construction Costs: Greater Than $500,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 3,864,339.00 To $ 4,271,112.00 Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 1,948.00 Per Calendar Day Beyond Substantial Completion. $ 1,625.00 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

52 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects