Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2022

February 15, 2022

June 20, 2022

Multiple Locations

Site Work

No Information to Display

$65,000.00

Public - County

img_map_placeholder

Multiple Locations, Greenfield, MA

Subscribe to View Full Documents

As of March 28, 2022, the project has been awarded. A timeline or construction has not been confirmed. PN - 21-0704 Franklin Regional Transit Authority (FRTA) Shared Streets Pedestrian Infrastructure Improvements Pedestrian Infrastructure Improvements at the Bus Stop on Elm Street at Elm Terrace in Greenfield, Massachusetts IFB FRTA Shared Streets Pedestrian Infrastructure Improvements Thank you for your request Morgan, an email will be sent to you with the attached IFB 20220118 FRTA Shared Streets Pedestrian Infrastructure Improvements . If you have any questions please contact us at : 413-774-3167 x 104. This email is sent immediately. Therefore, if you don't receive the email right away, check your SPAM folder to make sure it wasn't blocked. Elements of the Project include - A new section of sidewalk on the east side of Elm Street from Allen Street to the intersection of Elm Street and Elm Terrace (approximately 250 linear feet); A newly constructed widened section of sidewalk on Elm Terrace connecting to the intersection of Elm Street and Elm Terrace (approximately 60 linear feet); Construction of new bus stop waiting areas on the east and west sides of Elm Street and Elm Terrace (for the northbound and southbound buses) with new concrete pads, a crosswalk, signs, and curb ramps; A new bus shelter with a bike rack at the bus stop on the east side; A new shelter at the bus stop on the west side; and An improved curb-ramp on the east side of the intersection of Elm Street and Allen Street

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects