Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 1, 2024

November 30, 2025

1105 Charlottetowne Ave

Renovation

No Information to Display

$19,500,000.00

Public - State/Provincial

img_map_placeholder

1105 Charlottetowne Ave, Charlotte, NC

Subscribe to View Full Documents

Project Schedule: Project DesignSchematics - Completed Design Development Completion - by November 2023 Construction Documents Completion– by April 2024 Bid Completion - by June 2024 Construction – (An early Demolition package will be scheduled for summer 2024) Award – by August 2024 Construction Start – by September 2024 Construction Completion – by November 2025 Occupancy - Owner FF&E and Move In – by February 2026 Open – by February 2026 As of October 13, 2023, the project is in design development which is scheduled to be completed in November 2023. The owner received RFQ's for CM@Risk on August 2, 2023 and a selection is anticipated to be made by the Board of Trustees in November 2023. Construction is anticipated to begin in September 2024 and be completed in November 2025. *The closed solicitation has been included below for reference: Architectural Firms are needed to provide Design Services (including consulting engineers) for proposed renovations at the Old ATC Building on the Central Campus of Central Piedmont in Charlotte, NC. Old ATC (Advanced Technology Center) Building Renovations: a. Renovations of existing three story, 63,000sf building to convert former classroom and tech lab building into primarily administrative and support services office functions. b. Replacement of all major building systems (HVAC, lighting, power, data, fire alarm and security) and the addition of an automatic fire sprinkler system. c. Exterior wall reconstruction to replace precast panels and curtainwall with masonry and fenestration compatible with the campus. All questions should be directed to Gregory S. Long, AIA by phone or email. Contacting any other staff or faculty of CPCC will be basis for disqualification. Please submit Three (3) Hard Copies and One (1) digital copy (PDF Format via email) of the Request for Qualifications (RFQ) with a Letter of Interest. Hard copies and digital copy must be received prior to closing date and time. The RFQ shall not exceed 20 pages (one side only) or 10 pages (two sided) not including Letter of Interest (maximum of 2 pages). Short List Announced for Interviews: Thursday, January 20, 2022 Building Tour: Thursday, January 27, 2022 Interviews: Thursday, February 3, 2022 Contract Awarded: Wednesday, March 9, 2022

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.