Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 20, 2022

May 20, 2022

July 1, 2024

190 Lagrange St

Demolition, New Construction, Site Work

No Information to Display

$2,579,000.00

Public - County

img_map_placeholder

190 Lagrange St, Newnan, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The owner has selected a Construction Manager. The Coweta County School System is requesting proposals for a Construction Management Firm for new construction of replacement facilities for Newnan High School. The Coweta County School System plans to select the most qualified Construction Management Firm (hereinafter referred to as CM) to enter into a CM at Risk contract for the construction for the above referenced project. The proposed fee to be submitted as a part of the CM Proposal will include "Overhead and Profit" to be awarded as a percentage and "General Conditions" awarded on a fixed fee. The services to be performed by the CM will have as their objective the efficient, economical, and timely delivery of the project by managing the construction of the project within the time and cost limitations and within established quality requirements. The services will be performed during the pre- construction phase, construction phase and post construction phase including working with the owner in estimating, value engineering, arrangements of bid packages, bidding and award of the trade contracts, and management of construction until occupancy is achieved, and implementing the one (1) year warranty and one (1) year warranty inspection. The procedures for public works construction contracts as established by the Georgia Local Government Public Works Construction Law, O.C.G.A., 36-91-1 shall be followed. Final selection will be made in accordance with the policies and administrative directives of the School System and any other statutory provisions. To be accepted, all responses must be submitted in a sealed package marked "New Construction of: Replacement Facilities for Newnan High School - CM at Risk Services". Six (6) copies of each proposal must be forwarded or delivered to: Mr. Ronnie Cheek COWETA COUNTY SCHOOL SYSTEM Central Office 167 Werz Industrial Dr. Newnan, GA 30263

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.