Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2022

June 1, 2023

July 31, 2024

Multiple Locations

Renovation

No Information to Display

$14,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Orlando, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

A Multi-System Capital Renewal project for five sites: Columbia ES located at 650 E River Falcons Way Orlando Florida 32833, Moss Park ES located at 9301 N Shore Golf Club Blvd Orlando Florida 32832, Stone Lakes ES located at 15200 Stoneybrook Blvd Orlando Florida 32828, Vista Lakes ES located at 6050 Lake Champlain Dr. Orlando Florida 32829, and West Creek ES located at 5275 S Orange Blossom Trl Orlando Florida 32837. Major elements of the project include: 1. Replace Modified Bitumen Roofing System (all sites except West Creek ES) 2. Repair/Replace existing Lightning Protection system (all sites) 3. Replace Fire Alarm System / Intercom Systems/Intrusion Detection System (all sites except Stone Lakes ES and West Creek ES) 4. Renovation of the campus building heating, ventilation and air conditioning system (all sites except Columbia ES) 5. Replace BAS System and existing exterior pole mounted luminaires with LED (Columbia ES only) 6. Paint exterior doors and frames and clean and seal brick veneer (Stone Lakes ES only) 7. Replace Gutters and Downspouts (West Creek ES only) Each campus will remain occupied during design and construction. The estimated construction cost is $11,000,000 - $14,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated Award Date 4/12/2022 Target Schedule: Design/Pre-construction Services Commencement: May 2022 Construction Notice to Proceed: June 2023 Substantial Completion: July 2024

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects