Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 1, 2023

May 13, 2025

No Information to Display

555 E University Ave

Addition, Demolition, New Construction, Renovation, Site Work

No Information to Display

$21,000,000.00

Public - County

img_map_placeholder

555 E University Ave, Orange City, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The scope of services may include, but not be limited to, pre construction services, construction estimating, value engineering, bid preparation, construction management, generation and update of project schedules, cost control and progress reports. The Volusia County School Board is interested in entering into a contract with a qualified construction management firm to provide services of a specified nature as outlined in the contract to be entered into, the form of said contract being attached hereto, said services consisting of providing construction management services for renovations and additions at Orange City Elementary, 555 East University Avenue, Orange City Florida. The anticipated scope of the Project will consist of the demolition of the approximately 28,000 square feet of existing building space or as recommended by Castaldi analysis the addition of approximately 55,200 square feet of new construction and the renovation of approximately 19,000 square feet, to accommodate approximately 650 700 student stations and new parent pick up drop off loop. New construction shall be built to meet High Performance Building Criteria the building envelope shall be constructed using high-mass wall construction techniques, moisture and infiltration strategies, and insulation strategies to achieve a building envelope air leakage maximum of 0.20 CFM/SF and an EUI of less than 25. Construction shall be on an occupied campus. Work will be phased as necessary in order to prevent interruptions of student and staff services. Schenkel & Shultz, Inc. is the architect of record. The estimated construction budget is $21,000,000. Inquiries regarding this RFQ shall be in writing via email to Janice Lucas, Planning & Business Services, jllucas@volusia.k12.fl.us. Email must be time and date stamped no later than 3:00 PM on July 28, 2022. Written inquiries will be provided a written response via addendum that shall be made available at: https://www.vcsedu.org/facilities-design/construction-management-services The School Board of Volusia County Florida reserves the right to waive any informality in the selection process and to reject any or all submittals in the best interest of the School District. Shortlist Confirmed.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.