Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

March 18, 2024

April 30, 2025

8525 W Little York Rd

New Construction, Site Work

No Information to Display

$84,000,000.00

Public - County

img_map_placeholder

8525 W Little York Rd, Houston, TX

418

53

50

9

Subscribe to View Full Documents

Surface Water Supply Project - Central Pump Station and RePump Station Project Name: Surface Water Supply Re-Pump Station Facility Name: Re-Pump Station Location County: Harris Estimated Cost: $84M Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Pump station, operations center, and disinfection facility for West Harris County Regional Water Authority's Surface Water Supply Project. Square Footage: 18,628 ft 2 _____________________________________________ Scope of Contract is for construction of a 160 MGD Pump Station Facility including earthwork, pump station foundation and building superstructure, Operations Center; construction of two (2) 10-million-gallon pre-stressed concrete tanks; installation of pump station equipment and piping, including but not limited to pumps, motors, variable frequency drives, pump control ball valves, pump room traveling crane, interior piping and valves, floor drains, plumbing systems, 5kV switchgear and motor control centers, instrumentation and control, HVAC systems; construction of yard piping and associated appurtenances; construction of access roads, parking areas, fences, gates, and other site modifications; coordination and interface with the power company who will be providing service to the site, coordination and interface with third party on-site generation contractor; construction of a transformer yard, equipment pads, power poles and other appurtenances for primary power; site and building electronic surveillance and security; coordinate with others performing fiber optic installation and SCADA activities. Details of this work are provided in the Construction Drawings and Project Manual. This project is a part of the overall Surface Water Supply Project. Scope: CONTRACTOR shall provide all labor, materials, tools, services, equipment and incidentals required to furnish, install, test and place in satisfactory operation, fiber reinforced plastic handrails, stairs, and grating systems as specified herein and shown on the drawings. B. FRP stairs, handrails, and grating shall be a prefabricated system constructed to install without significant field cutting or fabrication. CONTRACTOR shall coordinate field measurements prior to submittal and include fully dimensioned fabrication drawings with the submittal.

140 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.