Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2024

No Information to Display

To Be Determined

Addition, Demolition, Paving, Renovation, Site Work

No Information to Display

$112,890,000.00

Public - City

img_map_placeholder

To Be Determined, Winter Haven, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Wastewater Treatment Plant #3 Capital Improvement program for the five-year planning will address: WWTP#3 is nearing its permitted capacity and will require expansion to accommodate future growth. Planned expansion fro 7.5 MGD to 12.0MGD is expected. Process Aeration and West Digestor Aeration improvements are scheduled to produce the required effluent treatment for the process of the sewage. Air Basin #2 Interior Painting. The basins are in an extremely abrasive environment and routine maintenance is required to preserve the infrastructure. With the development of the ILC to the south of WWTP #3 , rerouting of the existing Pollard Road and existing utilities are required. As of August 16, 2023, this project is included in the City of Winter Haven's FY 2022-2026 Capital Improvement Plan. Per owner the project will bid for RFQ in December 2023.The design completion and firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.