Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 29, 2021

June 15, 2022

November 15, 2022

Multiple Locations

Renovation

No Information to Display

$71,766.00

Public - City

img_map_placeholder

Multiple Locations, Eagles Mere, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of March 24, 2022, Apparent low bidder is Smith Plumbing, Heating, Electrical, LLC, Bid amount is $71,766.34 Eagles Mere Borough Authority is seeking bids to install 45 Kwh stand-by generators at two waste water treatment plants. Contact the Authority office at em17731@epix.net or 570 525 3247 to request bid documents and additional information. The method of Contractor Selection has not been Determined at this time. The installation locations are 153 Carl Rider Road, Eagles Mere, PA 17731 and 540 Eagles Mere Ave., Eagles Mere, PA 17731. AWARD IS ANTICIPATED ON OR ABOUT 12/13/2021 The owner (the Eagles Mere Borough Authority) owns and operates two sewage treatment plants that it wishes to equip with back-up power systems. The owner wishes to install one 45kw 3 phase 120/240 volt propane fueled generator at each plant as well as emergency communications equipment, in accordance with the Engineers letter dated 9/10/21 attached (Appendix A The owner requires that installation occurs during the periods of April 15 through June 15 or September 15 through November 15. Successful running of the equipment for 30 minutes under full load will be required as part of completion. Owner retains the right to modify the installation period to his benefit and to approve the selected contractors proposed installation schedule.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects