Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 11, 2021

May 2, 2022

August 1, 2022

To Be Determined

Site Work

No Information to Display

$310,640.00

Public - City

img_map_placeholder

To Be Determined, West Lafayette, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

For Track Resurfacing Work on the Ridgewood Campus The Ridgewood Local School District will be receiving bids for track resurfacing work on the Ridgewood Campus. Bids should be picked up in person to survey the project with the owners. Base Bid: 1. Drawing prepared by an Ohio Registered Surveyor or an American Sports Builders Assoc. certified track builder. 2. Remove existing rubberized surface from track, remove millings/debris and events and haul off site. 3. Prep milled surface for new overlay. 4. Apply 1.5" of 448 Type 1 hot mix asphalt 5. Sod removal (as needed) 6. Install black plexitrac lighting (or equal approved alternate) in the track and events prepared asphalt 7. Stripe track and events, per American Sports Builder Assoc. specs. 8. Add draining if necessary Alternates 1. Demo and reconstruct existing runways with 5' wide concrete 2. Remove and reconstruct existing Pole Vault area, High Jump area and Long Jump Sand Pit area. 3. Remove existing track asphalt to full depth, regrade and add to (if needed) existing stone and laser grade to meet exterior asphalt with 1% minimum slope towards the inside of the track. Additional detailed information will be provided within the bid packet. The paving and track surfacing contractor shall be a member of the American Sports Builders Association and have a certified track builder on staff. Prevailing wages IS applicable. The successful bidder is required to furnish a satisfactory Performance Labor and Material Payment bond from an acceptable surety in an amount equal to one hundred percent (100%) of the contract sum. The work provided will begin May 2022 (date approved by RLSD) and should be completed by August 1, 2022. The owner reserves the right to reject all bids and to waive informalities, irregularities and errors in the bidding to the extent permitted by law.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects