Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 27, 2022

December 31, 2022

Multiple Locations

Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Springfield, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of October 16, 2023, a design team has been identified. This procurement will provide for an extension of Design Engineering Services for the IDNR Statewide Design Services for Dam Removals/Modifications contract OWR-287. The services at a minimum will include project management, design coordination, permit application, preparation of specifications and plans and estimates sufficient for competitive bidding of DNR construction contracts. The Consultant will also provide services related to possible required revisions during the bidding process and/or to construction questions that arise from the contractor. The time extension is required due to the delay of work on Work Order (WO) #3. WO#3 includes the preparation of plans, specifications and estimates, bidding assistance and assistance during construction for the removal of two dams on the Sangamon River, and one dam on the Vermilion River. The additional services are germane to the original contract. This change order is in accordance with 720 ILCS 5/33E-9. Change Order Notice #4 to extend contract to 12/31/2022 CO #4 - Time extension is required due to the delay of work on Work Order (WO) #3. This time extension will allow for the completion of sealed bidding documents, permits, bidding assistance and construction assistance for two dam removals on the Sangamon River and one on the Vermilion River projects. The method of contractor selection has not been determined at this time.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects