Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 22, 2023
October 23, 2023
No Information to Display
111 N East St
Renovation
No Information to Display
$4,000,000.00
Public - State/Provincial
111 N East St, Kewanee, IL
The scope of work consists of removal and replacing the plumbing equipment, fixtures, and domestic water piping as well as upgrading the HVAC systems and providing new electrical connections to all equipment. The existing chiller and boilers will be removed along with hydronic piping throughout the building. A new VRF heat pumps system with ventilation air equipment will be installed. New kitchen ventilating hoods and associated systems will be provided. Roofing work associated with new rooftop equipment will be required. Asbestos containing material in the lobby will be removed. Lighting fixtures will be replaced with LED light fixtures and provided with updated controls. Single Prime Delivery Method: Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction, Article 00 21 05. GENERAL - under $4,000,000 Prequalification. Bidders and protected subcontractors must be prequalified with CDB; allow 45 days for application processing B. MBE/WBE/PBE/VBE. MBE/WBE/PBE/VBE firms must be certified or registered with State of Illinois Commission on Equity and Inclusion as an MBE, WBE, PBE, or VBE prior to bidding. C. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). D. Registration with the Illinois Procurement Gateway (IPG). All new and renewing vendors that request either Architect/Engineer, Construction Manager/Program Manager, or Contractor prequalification must be an "Active (Accepted)" registrant in the IPG. Vendors not subject to prequalification renewal prior to time of bid may pre- register with the IPG and receive a vendor registration number. The IPG is a web based system that serves as the primary location for entering, organizing, and reviewing vendor information. The IPG allows prospective vendors to provide disclosures, registrations, and other documentation needed to do business with the State in advance of any particular procurement. E. Certifications and Disclosures. New vendors and vendors renewing prequalification must have an approved Illinois Procurement Gateway registration number and completed Form B. Vendors not subject to prequalification renewal prior to time of bid have the option to submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, be registered with the Illinois Procurement Gateway, will result in rejection of bid. F. Subcontractors. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $100,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. G. Supplement to SDC. Bidders are advised to review Article 01 11 01, Supplement to SDC, for any revisions to the Standard Documents for Construction. H. Progress Payments. Progress payments will normally be issued by the Illinois Comptroller within 30 business days after CDB receives and approves an Invoice-Voucher. I. For Single Prime Delivery Method Projects: Any reference in the Specifications and the Drawings for Multiple Prime Trades shall be considered as the Prime Bidding Trade. J. Bid Protest. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Kewanee, IL
Bid Date: Aug 24 2023
Kewanee, IL
Bid Date: Oct 20 2023
Kewanee, IL
Bid Date: Jun 18 2021
Kewanee, IL
Bid Date: Sep 23 2024
Kewanee, IL
Bid Date: Sep 10 2024
Kewanee, IL
Bid Date: Sep 23 2024
Kewanee, IL
Bid Date: Jul 25 2023
Chicago, IL
Bid Date: Aug 22 2023
Orland Park, IL
Bid Date: Aug 22 2023
New Lenox, IL
Bid Date: Aug 22 2023
Rockford, IL
Bid Date: Aug 22 2023
Sparta, IL
Bid Date: Aug 22 2023
Sparta, IL
Bid Date: Aug 22 2023
Sparta, IL
Bid Date: Aug 22 2023
Sparta, IL
Bid Date: Aug 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.