Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

December 16, 2024

No Information to Display

1111 N Rd

Addition, Demolition, Remodeling, Site Work

No Information to Display

$9,696,000.00

Public - State/Provincial

img_map_placeholder

1111 N Rd, Mauston, WI

8

Subscribe to View Full Documents

In general, the work consists of: approximately 8,900 square feet of the existing Skilled Care Unit facility that is to be remodeled in phases; and a new 2,400 square foot building addition consisting of (8) eight new wet cells, one office, and one storage room. The new addition shall be built with spread footings, concrete slab, concrete block bearing walls with block rain screen to match existing, thermally broken aluminum frame 60-minute attack rated windows, and a precast plank roof with tapered EPDM roofing system. The new Skilled Care Unit Expansion footprint currently conflicts with existing underground power and telecommunications circuits. As part of scheduling of the project, temporary and new power and telecommunications need to be constructed and completed in its entirety prior to the start of the Skilled Care Unit Expansion foundation buildout. The scope of work as it relates to power and telecommunications, and the creation of a new route for power and telecommunications circuits is described in detail on the “Site” Electrical set of drawings. Additional coordination with the Agency will be required as multiple outages are expected. This work shall be discussed in detail during the preconstruction meeting in order to coordinate all services to keep outages to a minimum.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.