Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 14, 2021

November 15, 2021

January 10, 2022

Multiple Locations

Site Work

No Information to Display

$279,790.00

Public - City

img_map_placeholder

Multiple Locations, Concord, CA

Subscribe to View Full Documents

The work to be done in general consists of mobilization, traffic control, and to furnish all labor materials, equipment and services required to replace existing streetlight fixtures with new LED fixtures, and all other work as specified in these Special Provisions. The Contractorshall possess and maintain all applicable licensesrequired to perform the work under this contract, including a Class "C-10" Electrical license. The Contractor may elect to receive 100% of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code and with applicable City regulations. Such securities, if deposited by the Contractor, will be valued by the City's Finance Director, whose decision on valuation of the securities will be final. Bids shall be in a sealed envelope entitled "PJ 2566 - Arterial/Collector LED Streetlight Retrofit". Bids shall be dropped off using the mail slot at the entrance to Wing A. Contact the City Clerk at (925) 671-3495 for questions or assistance in dropping off bids. ALL BIDS SHALL BE PRESENTED UNDER SEALED COVER AND SHALL BE ACCOMPANIED BY CASH, CASHIER'S OR CERTIFIED CHECK OR A BIDDER'S BOND EXECUTED BY A CORPORATE SURETY INSURER. THE BIDDER'S GUARANTEE SHALL BE IN AN AMOUNT EQUAL TO AT LEAST TEN PERCENT (10%) OF THE AMOUNT BID AND MADE PAYABLE TO THE CITY OF CONCORD. For information regarding the project, contact Jesse Crawford, Public Works Superintendent, at jesse.crawford@cityofconcord.org. The deadline for submitting questions about this project is 10:00 AM on October 7, 2021. Furnish all labor materials, equipment, and services necessary to retrofit/replace existing streetlight fixtures with new LED fixtures on the following City Street segments: • Ayers Road: Ygnacio Valley Road to Myrtle Drive • Clayton Road: Market Street to Sutter Street, and Park Street to City limit • Concord Avenue: City limit to Market Street • Concord Boulevard: Port Chicago Hwy to City limit • Cowell Road: Monument Boulevard to Ygnacio Valley Road • Market Street: Meadow Lane to Concord Avenue • Meadow Lane: Monument Boulevard to end of the street • Monument Boulevard: Mohr Lane to Cowell Road • Oak Grove Road: City limit to Monument Boulevard • Port Chicago Highway: Pacheco Street to City limit • Treat Boulevard: City limit to Clayton Road • Turtle Creek: Treat Boulevard to Ayers Road • Willow Pass road: Contra Costa Boulevard to Gateway Boulevard, and Port Chicago Hwy to Avila Road • Ygnacio Valley Road: City limit to Clayton Road

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.