Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 8, 2024

No Information to Display

701 Briarheath Ave

Addition

No Information to Display

$22,000,000.00

Public - City

img_map_placeholder

701 Briarheath Ave, Napoleon, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Plans consist of a two-story, 82,000-square-foot addition that would house athletic/academic spaces. The addition would include a space for a three-court gymnasium with a three-lane walking track around the courts, a turf area that would serve football and soccer, as well as having netting for batting cages for baseball and softball. Connected to that space between the new gyms and the natatorium would be locker rooms, storage spaces, coaches offices, changing rooms and a wrestling room that could double as a staging area for the natatorium. Across the atrium, there would be a community room/virtual reality lab, and a weightroom/training room facility. A hallway from those spaces would run north to end of the building, where new vo-ag classrooms, an office, storage room, metal shop and wood shop would be located at the west end of the building. The metal and wood shops would include garage doors to move materials in and out more easily. East of the hallway, or just west of the existing building by the junior high gymnasium, new locker rooms, coaches offices/changing rooms, restrooms and a new concession stand would be included. The existing locker rooms near the junior high gym would be converted into referee changing rooms. As of October 13, 2023, this project is on hold. A timeline for construction has not been announced.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.