Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

January 1, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$699,900.00

Public - City

img_map_placeholder

Multiple Locations, Conroe, TX

Subscribe to View Full Documents

The SJRA Highlands Division delivers raw water to multiple municipal, industrial, and irrigation customers through the maintenance and operation of three pump stations, 27-miles of canal, a 1400-acre reservoir, and over 60 siphons and culverts. Highlands Siphon 7 Improvements Phase 2, hereafter called "Project" is located at the intersection of the SJRA Main Canal and FM 2100 in Crosby, Texas. Individual who has full-time employment as a peace officer is one who is actively employed in a full-time capacity as a peace officer working, on average, a minimum of 32 paid hours per week, being paid a rate of pay not less than prevailing minimum hourly wage rate set by federal Wage and Hour Act and entitled to full benefits of participation in retirement plan, vacation, holidays, and insurance benefits. A reserve peace officer does not qualify, under this definition, as a peace officer. Owner's Representative reserves the right to require proposed product to comply with colour and pattern of specified product if necessary to secure design intent. After areas to receive topsoil have been brought to grade, and immediately prior to dumping and spreading topsoil, loosen subgrade by discusing or by scarifying to a depth of at least 2 inches to permit bonding of topsoil to subsoil. Compact by passing bulldozer up and down slope, tracking over entire surface area of slope to create horizontal erosion control slots. All questions and inquiries about this Solicitation shall be submitted using the EMarketplace System site or during the Pre-Proposal Conference, if applicable. The deadline for written questions is 11:00 AM CST on October 16, 2023 Any questions submitted via the E-Marketplace System website shall be equivalent of contacting the SJRA Purchasing Department directly. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda and posted on the E-Marketplace System website

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.