Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 7, 2022

July 1, 2022

October 28, 2022

2430 W Rogers St

Renovation

No Information to Display

$82,400.00

Public - City

img_map_placeholder

2430 W Rogers St, Milwaukee, WI

Subscribe to View Full Documents

Chiller Replacement for Boys and Girls Club BID GUARANTY TO ACCOMPANY BID: MPS Bid Bond, Certified or Cashier's Check: 10% of Contractor's Base Bid. The are no HUB, COIN, Student Employment / Participation requirements for this bid. Plans and specifications will be loaned to a prospective bidder upon receipt of the deposit listed, which deposit will be returned upon surrender of the plans and specifications in good condition. Bid documents must be returned only to A/E Graphics, Inc. All questions should be submitted in writing prior to 12:00 PM on Tuesday, May 31, 2022 to electronically. No questions may be answered after that date and time. No questions shall be answered verbally. No verbal information from any source is to be relied upon by any respondent in the development of their Bid. Written questions and responses will be documented by way of addenda, which will be forwarded to all bidders. Each bid shall be for a fixed lump sum. Bids shall be submitted on-line through A/E Graphics On-line Plan Room, electronically using the "Submit Bid" tab on the CHILLER REPLACEMENT FOR BOYS AND GIRLS CLUB - Rogers Street Academy project information page from which bid documents were obtained. Submit bid forms per Instructions to Bidders, Article B-5 of the Specifications. Wisconsin Statutes in accordance with plans and specifications for the following work: All contractor(s) and subcontractors(s) are subject to the current livable wage rate, in accordance with the City of Milwaukee Ordinance 310-13. Per 2015 WI Act 55, prevailing wage rate laws have been repealed for all MPS Construction Projects beginning January 1, 2017. The right is reserved to reject any or all bids or to waive informalities. Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals at the bid opening through sign language interpreters or other auxiliary aids.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects