Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 30, 2021

May 16, 2022

No Information to Display

US-89

Paving, Site Work

No Information to Display

$2,577,084.00

Public - State/Provincial

img_map_placeholder

US-89, Clearfield, UT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This Is a P+t (Price + Time) Project. Wage Rates: Apply Engineer's Estimate: Greater Than $1.5m but Less Than or Equal to $3m (Qualified Health Insurance Required) Project Location: US-89; Victory Road to Davis Co. Line The principal items of work are as follows (for all items of work see attachment): 1/2 Inch HMA PG 64-34 (Spray Paver Applied) Open Graded Surface Course (Spray Paver Applied) Rotomilling - 3 Inch The project is to be completed: to be determined by competitive bid. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UTOT - US-89; Victory Road to Davis Co. Line Rehabilitation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time charges begin based on the following: 1. The Contractor notifies the Engineer in writing of the desired start date. 2. The start date must be on or after the Early Start Date and before the Late Start Date as defined below: a. Early Start Date - May 16, 2022 b. Late Start Date - July 11, 2022 3. If the Contractor fails to notify the Engineer 14 calendar days prior to the Late Start Date, then contract time begins on the Late Start Date.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects