Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

December 9, 2024

September 6, 2027

PA-61

Paving, Site Work

No Information to Display

$12,500,000.00

Public - State/Provincial

img_map_placeholder

PA-61, Upper Bern Township, PA

Our team is requesting plans for this project.

Subscribe to View Full Documents

This Partial Design/build Project is for Resurfacing, Safety Improvements, Drainage Improvements, Guiderail and Median Barrier Installation, Ada Curb Ramps, Bridge Maintenance Work Including Deck Repairs, Guiderail Upgrades, Design/build Moment Slab Installation and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 0061, Section 14m, in Berks County, Tilden Township From Approximately 1900' South of Cabela Drive at Segment 0374 Offset 0985 and Segment 0375 Offset 0920 to Approximately 500' North of the Berks County/schuylkill County Line at Segment 0010 Offset 1300 and Segment 0011 Offset 1300 in Schuylkill County, Port Clinton Borough. Project Cost Range:$10,000,000.00 - $12,499,999.99 Federal Project Status: Penndot Oversight Nhs Structure Work:10.00% Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Widening/resurfacing (No Additional Lanes) Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - PA 61 Restoration Phase 1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects