Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 7, 2023

March 11, 2024

No Information to Display

4300 Community Ave

Addition, Renovation, Site Work

No Information to Display

$114,452,019.00

Public - County

img_map_placeholder

4300 Community Ave, McKinney, TX

Our team is requesting plans for this project.

Subscribe to View Full Documents

Plans call for a three-story expansion to the adult detention facility totalling 168,400 square feet. The project is staged in three phases to keep the vehicle sally port in operation as long as possible. Contact the bidding GC(s) for access to the project documents and addenda, as the information has been classified as confidential in nature. Note from Sedalco Construction: ***PLEASE NOTE*** You will find references to Alternates 1, 2, 3, and 5 in the drawings. THESE ALTERNATES ARE TO BE IGNORED. Base bid is any area not labeled Alternates 1, 2, 3, 4/4a, or 5, and the only alternates that apply are indicated below and in Section 01 23 00 ALTERNATES: • Alt. 4/4a - Infirmary Remodel: Build-out of floor as indicated on Dwg. 1 on A231 - LEVEL 1 - FFMO/ADMIN & CLINIC FLOOR PLANS. • Alt. 6a - CPT3 Flocked Vinyl at base bid dayroom areas in lieu of polished concrete. • Alt. 7a - Terrazzo flooring and base at base bid showers and drying areas in lieu of epoxy. • Alt. 7e - Terrazzo flooring and base at Alternate 4 Infirmary Remodel area in lieu of epoxy. • Alt. 8a - Temporary chiller costs (monthly), including set up/take down to accommodate 310 TONS of cooling capacity. • Alt. 9 - Add 300' of 4 each 6" conduits for electrical and 300' of 4 each 4" conduits for data including 2 each 5' deep x 8' wide 2 hour rated vault enclosures (in the event existing power and data lines require relocation). Addendum #1-#3 have been issued as of 10-27-2023.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.