Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 7, 2026

October 4, 2021

October 15, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$235,000.00

Public - City

img_map_placeholder

Multiple Locations, Woods Cross, UT

Subscribe to View Full Documents

Woods Cross City is requesting bids for the West Legacy Trail Paving Project. The project consists of constructing a 7,000 LF, 10 wide, asphalt trail on an existing gravel trail. The Owner reserves the right to waive any informality or to reject any or all Bids. Woods Cross City Corporation is an Equal Opportunity Employer. A. Measurement and Payment for the bid items listed in Base Bid shall be on the basis of the description in the Technical Specifications and Drawings. Unless the work to be done is so specifically called out to be measured and paid for in Base Form, payment for such work shall be included in other applicable items, and there shall be no separate measurement and payment for work. B. Items listed in Document C-410 - Bid Form as lump sum (L.S.) shall include all work for the complete installation as generally described in the Drawings and Technical Specifications. C. Payment shall be made at the contract bid price listed in the Bid Form. D. Partial payment for unit price bid items and lump sum bid items only partially completed at the end of monthly pay periods shall be made based upon the Engineer's interpretation of the percentage of work completed. Partial payment for materials delivered and stored will be considered, if said materials have been submitted to the Engineer for review and supporting invoices and documentation have been provided.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects