Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 18, 2023

August 30, 2024

2300 East St

Addition, Site Work

No Information to Display

$3,700,000.00

Public - County

img_map_placeholder

2300 East St, Texarkana, AR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Plans call to expand the jail's inmate detention space by at least 6,500 square feet to accommodate another 48 beds.Formerly known as the Jail Expansion Phase 1 - Miller County. As of July 18, 2023, this project is out to bid for the following bid packages: Bid Package No. 1 Site Clearing, Grading and Storm Drainage Package Bid Package No. 2 Security and Non-Security Fencing and Gates Package Bid Package No.3 Cast-in-Place Concrete Package Bid Package No. 4 Masonry Package Bid Package No.5 Structural Steel &Miscellaneous Fabrications Package Bid Package No.6 Caulking, Sealing, Dampproofing and Fire Caulking Package Bid Package No. 7 Roofing and Roof Accessories Package Bid Package No.8 Drywall Systems, Acoustical Ceilings and Security Ceilings Package Bid Package No. 9 Epoxy Resin Composition Flooring and Walls Package Bid Package No.10 Painting and Alternate Drywall Systems Package Bid Package No. 11 Miscellaneous Items Package (Furnish & Deliver Only) Bid Package No. 12 Detention Equipment & Security Electronics Package Bid Package No. 13 Fire Protection Sprinkler Systems Package Bid Package No. 14 Plumbing Systems and HVAC Package Bid Package No. 15 Electrical Systems and Fire Alarm Package Bid Package No. 16 Aluminum Walkway Covers Package An addition adjacent to the building of 1,420 sf with 2 hour separation walls used to isolate the additional areas from the existing facility. An addition separated from the existing building as a separate structure is to be added of 4,805 SF. Each structure will be one story. Construction is expected to start mid-September 2023. Construction is anticipated to take approximately eleven (11) months, with completion August 2024.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.