Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2021

October 11, 2021

No Information to Display

Weedon St

Paving, Site Work

No Information to Display

$438,000.00

Public - City

img_map_placeholder

Weedon St, Centreville, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Town of Centreville is accepting sealed bids from qualified and interested bidders for the following project: The Weedon Street complete reconstruction project generally consists of scarification/milling and removal of existing roadway surface, full depth removal of existing curb, gutter and sidewalk, removal of existing cast iron sewer, providing new 8" sanitary sewer main with manhole and clean-out and new 6" water main with new sewer and water house connections, fire hydrant and connection to new main, new curb and gutter and ADA compliant sidewalk and driveway ramp. The Town of Centreville reserves the right to reject any and all bid proposals, to waive any requirements and to accept all or part of any proposal considered to be in the best interest of the Town. Award of the contract is subject to the approval of the Town Manager and Town Council of Centreville. Contact: Michael C. Whitehill, Project Administrator (c) 443-988-1947 or by e-mail - michael@whitehillconsultingllc.com The Town of Centreville is an Equal Opportunity Employer. Discrimination based on age, race, sex, handicap or national origin is expressly prohibited. A. The specific scope of services is as follows: B. Provide OWNER construction schedule. C. Coordinate with local utility companies. D. Work hours are from 7:00 a.m. to 6:00 p.m. If any night work is needed, this will require permission from the Town. E. Sequence of construction is as follows: Submit Maintenance of Traffic plan meeting MSHA requirements to Town of Centreville and MSHA for approval. Contact and coordinate with Miss Utility for location of underground utilities no later than two (2) weeks prior to construction. Schedule and conduct preconstruction meeting with the Town of Centreville and its inspectors, MSHA, MDE etc. to ensure appropriate permits and scheduling are in place. Commence construction with utility work in Weedon Street (maintain traffic with minimum lane constrictions) and test utilities to Town of Centreville specifications prior to refill. Refill and compact to subgrade. After subgrade compaction testing, provide bituminous concrete surface as specified. The desired grades and flowline patterns for final paving other than that provided in the typical street section will be provided by the Director of Public Works. F. All work shall be performed in compliance with in accordance with The Town of Centreville Standards and Specifications, and MSHA Annual and Master permit.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects