Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 19, 2021

August 16, 2024

No Information to Display

Plan 1912116, Block 100 Dawson Boulevard

New Construction, Site Work

No Information to Display

$5,500,000.00

Public - State/Provincial

img_map_placeholder

Plan 1912116, Block 100 Dawson Boulevard, Chestermere, AB

Subscribe to View Full Documents

Pre Eng Steel Building Design: The superstructure for the Chestermere Field House & Civic Centre will consist of the following components: 1. Supply and install of Pre-engineered steel columns, joists, beams, girts & cross bracing. 2. Supply and install of corrugated metal decking c/w Nelson stud. 3. S & I miscellaneous metal required for the Pre-Eng Installation installation including but not limited to embed plates, connecting brackets, hangers, tension tie rods and anchor bolts. 4. S & I fasteners and accessories (nuts, bolts, etc.,) TIMELINE: Construction Manager was secured in 2021. Project was subsequently put on hold by the owner to determine the feasibility of proceeding with this project. Scope of work is subject to change. Further update may be available by early 2024, pending owner's decision to proceed. Estimated Value: $2,500,000 (Field House Structure) $2,000,000 to $3,000,000 Envelope (portion of exterior walls and or roof).

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.