Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2022

October 17, 2022

May 11, 2024

To Be Determined

Renovation

No Information to Display

$19,829,600.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Baltimore, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of October 6, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The work under this contract includes, but is not limited to, work required to upgrade the north and south substations at BWI Marshall. This work includes but is not limited to: (1) Replacement of existing 35kV Switchgear at the BWI North and South Substations to accommodate new BGE feeders, (2) Upgrade of relays and metering for three 15kV Switchgear lineups, (3) Life Safety, Security and HVAC Improvements at the Switchgear locations, (4) Switchgear foundations and fencing relocation, and (5) Coordination with BGE. See paragraph GI-1.04 for additional description. Procurement Program Participation Goals DBE Participation (%) 9.0 This item shall consist of the performance of construction preparatory operations, including the movement of personnel, equipment, and materials to and from the project site; field survey and stake-out; payment of performance bond, payment bond, guaranty bond, and other insurance premiums; cranes and equipment rented; the creation, maintaining and submittal of final record drawings; general requirements of the Contract not otherwise included in pay items; and for the establishment and subsequent removal of the Contractor's offices and other facilities necessary to begin and sustain work on a substantial phase of the contract. At the completion of work, all areas disturbed by the Contractor's operations shall be restored to substantially the same condition as existed prior to commencement of mobilization operations

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects