Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 25, 2023

January 27, 2025

163 Scannell Blvd

New Construction, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

163 Scannell Blvd, Bethany Beach, DE

Subscribe to View Full Documents

* Additional documents including plans are available from the owner. * The State of Delaware, Delaware Army National Guard is soliciting Request for Proposals (RFP) from teams interested in providing Design-Build services for DEARNG CONTRACT NO. 2020-16, PN 100103 - BETHANY BEACH TRAINING SITE (BBTS) TRANSIENT TRAINING OFFICER QUARTERS. An in-person pre-RFP meeting will be held on June 20, 2023 at the Biden National Guard/Reserve Center, 1 Vavala Way, New Castle, DE 19720 at 11:00 AM to discuss the project requirements and specifiations. The Project involves designing and constructing one (1) of two (2) concepts: Concept 1: A new two-story single building, 11,977 GSF, that accommodates the full program, including 32 SLQ suits (Bedroom and Bathroom), and shall be referred to as the "Motel Concept" (MC). Concept 2: An assembly of six separate structures ("Units") arranged side by side, with eight SLQ rooms each. These buildings are on raised piles, so each building is paired with an adjacent partner to share an exterior deck access stairs, and ramp in the case of the one accessible building ("HC Unit") and shall be referred to as the Village Concept (VC). The selected concept will provide all required program function utilities, storm drainage, communications, electric, HVAC, fire protection/alarm systems, IDS, EMCS, force protection measures, paving, walks, curbs, parking, access, exterior lighting, site improvements, grading and landscaping. The new facility is to be designed and built to achieve LEED Silver Certification. Construction Completion 490 Days from NTP

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.