Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2022

No Information to Display

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, Waterville, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

1:30 P.M. - SP-2021-01 (Douglas County PUD 1) A proposal for a shoreline development permit to construct a transmission line and associated facilities in the northern mid-Columbia area of Washington State. The first landing is located along the existing corridor within Rock Island (which will be processed by the City of Rock Island) and the second connecting to the Columbia Substation near the Palisades Rd turnoff within the Rural Conservancy Shoreline Environment. The new transmission line would reduce congestion by providing increased capacity for power flows to several transmission facilities in the northern mid-Columbia area. The subject properties are located along the Columbia River in Douglas County and Chelan County. The properties are located in shoreline jurisdictions and construction will take place within existing transmission line easements. The Assessor's Parcel Numbers are, 21222820005, 21222820021 and 21222130003. As of July 29, 2021, the project was in the Douglas County Agenda Meeting on July 15, 2021. It is currently unknown what approvals have been obtained. Information regarding design firm and general contractor selection timelines has not been released. The construction timeline has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.