Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 17, 2022

April 15, 2022

November 4, 2022

To Be Determined

Renovation, Site Work

No Information to Display

$3,675,605.00

Public - City

img_map_placeholder

To Be Determined, Little Elm, TX

Subscribe to View Full Documents

Question Cutoff Date 2/1/2022 12:00:00 PM (ET) Varying width concrete walkways, site furnishings including (outdoor game tables, picnic tables, benches, drinking fountain, trash receptacles), 5,500 sf. playground area including fibar and poured in place surfacing, 2,800 sf. Concrete water play area, 3,000 sf. performance pavilion including restrooms, entry gateway structure; ADA signage, planting and irrigation improvements, pedestrian and feature lighting, and other miscellaneous park features as indicated on the drawings. Site demolition includes 360 linear ft. of chainlink fence, two large existing trees, and fine site grading. Questions will be accepted until February 1, 2021 at 11:00 AM.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.