Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 2, 2024

No Information to Display

Multiple Locations

New Construction, Paving, Site Work

No Information to Display

$10,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Prince Rupert, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

Development of new housing and office space required by growth related to activities at the Port of Prince Rupert. This may include building space for the Prince Rupert Port Authority and port-related industries. The Client is willing, subject to terms of the Contract, to actively engage with the Port of Prince Rupert and other potential commercial and institutional occupants of the Gateway project to assist in marketing and disposition of the project. Two of the entities which comprise the Client wish to become owners of space in the Gateway Project generally as follows: a) Northern Savings requires 15,000 to 20,000 square feet of space for a new credit union branch; and b) The City requires approximately 10,000 square feet of space for a civic institutional use. Additionally, the City wishes to develop 3rd Avenue adjacent the development lands as a pedestrian mall with covered areas, public amenities such as landscaping, seating and public art (the Pedestrian Mall Work). The lands on which the Gateway Project is envisioned are shown on Map 1 and generally des0cribed as follows: 1) Block 18 Parcels": 2,971 Square Meters of land, legally described as Lots 13-24, Block 18, Section 1, DL251, Range 5, Coast District, Plan 923, owned by Northern Savings Credit Union; 2) Block 34 Parcels": 3,038 square meters of land, legally described as Lot 52-63, Block 34, Section 1, DL251, Range 5, Coast District, Plan 923 owned by M & M Ventures Ltd.; 3) 891 square meters of land owned by the City, labeled as Lane, as shown on Map 1 which may be closed as road and merged with the Block 18 Parcels; and 4) The road shown as 3rd Avenue on Map 1, owned by the City, which may be closed to traffic and developed as a covered pedestrian mall as a part of the Gateway Project. TIMELINE: Request for proposals seeking proposals from entities interested in and capable of developing the Gateway project, is cancelled. Project may be updated when a re-tender is approved; timelines are undetermined. Further update may be available late spring 2023, upon approvals. *iPlan Planning and Development Services is the consultant.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.