Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2024

December 2, 2024

Multiple Locations

Site Work

No Information to Display

$15,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Kelowna, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

The objective of this project is to divert flows from Mill Creek to Brandts Creek near Spall Rd, to limit flood potential along Mill Creek within Kelownas urban centre. Flood peaks would be trimmed off and routed along Clement Avenue towards the lake. Brandts Creek, which is already a poorly defined ditch through the industrial area, would be completely updated as part of this flood protection project. This project has the added benefit of re-establishing Brandts Creek as a naturalized creek and linear park along the Rail Trail, providing options for fish passage, spawning, public access, and flood protection to the industrial area. Two new road crossings and creek daylightings would be provided along Recreation Avenue. Adjustments would be made to add control to the Sunset Drive culverts. TIMELINE: Project is pending budget approvals. Request for Qualifications for consulting services have closed and two consultants have been selected. Further update in late summer 2024, pending funding.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.