Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2022

February 24, 2022

August 23, 2022

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Frankfort, KY

Subscribe to View Full Documents

As of July 29, 2023, construction is underway, however, an exact timeline for construction has not been confirmed. No further inquiries to be accepted. After award of a contract, the General Contractor will be furnished, without charge, 2 sets of plans and specifications. Subcontractors, manufacturers, and suppliers shall obtain plans and specifications from the General Contractor. Emailed proposals for the Contract shall clearly state the bid number, project name, and Bidder's name in the subject line using the following format: "Bid No. 2202109-68 FSD E.C. McManis WWTP Blower Replacements--Bidder's Name" The email shall contain the following text (with the bid documents attached in PDF format): "Proposal for City of Frankfort Frankfort Sewer Department, E.C. McManis WWTP Blower Replacements, Frankfort Bid No. 2202109-68 Not to be opened until 2:00 p.m. EST (local time), Tuesday, January 25, 2022" Time allowed for completion of the Project is: 180 consecutive calendar days. Please email David Schrader at dschrader@hkbell.com with questions Bids shall be accompanied by a certified check or bid bond payable to the City of Frankfort in an amount not less than ten percent (10%) of the base bid. No bidder may withdraw his bid for a period of ninety (90) days after the date bids are opened. He may, however, withdraw his bid at any time prior to the time and date scheduled for opening of same or any authorized postponement thereof. Any bid received after the time and date specified will not be considered and will be discarded. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must COMPLY WITH Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, Section 3 Segregated Facilities, Section 109, and the Contract Work Hours Standard Act. Federal law prohibits discrimination on the grounds of race, color, national origin, religion, age, handicap, and sex in this Project. Minority firms are particularly encouraged to participate. The City of Frankfort Sewer Department reserved the right to reject any and all bids and to waive formalities and any bid that is obviously unbalanced may be rejected. The Responses will be reviewed and evaluated by a selection committee according to evaluation factors established in the bid documents. *This project has been awarded and all trades have been let.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects