Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2021

September 23, 2021

December 2, 2021

Multiple Locations

Site Work

No Information to Display

$300,000.00

Public - County

img_map_placeholder

Multiple Locations, Conroe, TX

Subscribe to View Full Documents

Solicitation no- 700891001 The Engineer will provide construction surveying stakes for line and grade to construct the water, sewer, and drainage improvements in accordance with the Contract Documents. Construction stakes to be provided will be as follows: Alignment of all water lines will be staked on centerline of water line. Stakes will be at 100-foot stations on tangent sections and at 50-foot stations along curves. Stakes will be provided at all valves, blow offs, bends, reducers, plugs, and ends of restrained joint sections. Offset stakes will be provided at all flush valves. Cut to top of curb will be provided at flush valves. Grades will also be provided for restrained joint sections and in other areas where depth is critical. Radius points will be set on cul-de-sacs. Offset stakes will be provided at all sanitary sewer manhole locations. When the distance between manholes is greater than 300 feet, an offset stake will be set at the midpoint between the manholes Offset stakes will be provided at all storm sewer manhole locations. When the distance between manholes is greater than 300 feet, an offset stake will be set at the midpoint between the manholes. to substantially complete the Drainage Work in 120 calendar days and to complete all final work within 15 calendar days after the initial field inspection with Montgomery County for acceptance of the work has taken place The successful bidder must furnish a Performance and a Payment Bond, each in the sum of 100 percent of the Contract Price and a one-year Maintenance Bond for 100 percent of the Contract Price

72 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.